What does planning permission control?

Planning considers how a development affects the use and appearance of land and buildings, and its relationship with the surrounding area. For an extension, this can include its size, height, position, design, effect on neighbours, heritage considerations and local planning policies.

Some household extensions may be permitted development, meaning a planning application is not required if the proposal meets all applicable rules. Where permitted development does not apply, a householder planning application may be needed.

What do Building Regulations control?

Building Regulations set standards for the construction and performance of building work. They cover matters such as structural safety, fire safety, energy efficiency, ventilation, drainage, moisture protection, access and protection from falls.

For an extension, the technical design may need to demonstrate suitable foundations, structural support, insulation, glazing performance, ventilation and safe connections to the existing building.

Can you have permitted development and still need Building Regulations?

Yes. Permitted development is a planning route. It does not mean the building work is automatically exempt from Building Regulations. Many extensions that do not require planning permission will still need Building Regulations approval or to comply with applicable requirements.

Can you get planning permission but fail Building Regulations?

Yes. Planning permission approves the development in planning terms; it does not certify that the construction details meet technical standards. A planning-approved design may need further development before it is ready to build.

What drawings are needed?

Planning drawings usually communicate the proposed layout, elevations, site context and external appearance. Building Regulations information is more technical and may include construction details, sections, insulation build-ups, structural information, drainage proposals and specifications.

The level of information required depends on the project and the approval route. A structural engineer may also be needed where the work involves significant load-bearing alterations or unusual structural elements.

What is the best order to do things?

  1. Establish the brief, survey the property and identify site constraints.
  2. Check whether planning permission, permitted development or another planning route applies.
  3. Develop the design and resolve the main layout and structural approach.
  4. Prepare and submit the planning application if required.
  5. Develop the technical design and coordinate structural and other specialist input.
  6. Obtain the relevant Building Regulations approval before commencing work where required.
  7. Agree the construction scope, tender and programme.

Do not assume one approval covers the other

Planning permission does not replace Building Regulations approval, and Building Regulations approval does not grant planning permission. There may also be separate matters to consider, such as party wall procedures, listed building consent, drainage approvals or restrictions in the property's title.

Architectural design and approvals in Birmingham and Solihull

GEVDÉ helps homeowners and developers coordinate feasibility, architectural design, planning applications, technical drawings, consultant input and construction delivery across Birmingham, Solihull and the wider West Midlands.

The correct approvals depend on the property and the precise work proposed. Check the position with the local planning authority and building control before starting construction.

Planning a project?

GEVDÉ supports homeowners and property developers with feasibility, architectural design, planning applications, technical drawings and construction delivery across Birmingham, Solihull and the wider West Midlands.

Discuss your project

Back to insights