When might an extension not need planning permission?

Some household extensions fall within permitted development rights. These rights allow certain works to proceed without a full planning application, provided every relevant limitation and condition is met. The rules can cover some rear extensions, side extensions, roof alterations and outbuildings.

There is no single allowance that applies to every house. The permitted development limits can depend on whether the proposal is single or two storey, how far it projects, its height, its position relative to the original house and the proportion of the garden it covers.

When is planning permission more likely to be required?

  • A side extension that does not meet the permitted development limits.
  • A two-storey extension close to a boundary or extending beyond the permitted depth.
  • Work to a flat, maisonette or a property where relevant permitted development rights do not apply.
  • A property in a conservation area or another designated area where additional restrictions apply.
  • A property affected by an Article 4 Direction or a previous planning condition removing permitted development rights.
  • A proposal that materially changes the roof, front elevation or overall appearance beyond what the permitted development rules allow.

Does living in a conservation area change the rules?

It can. Conservation area controls may restrict certain permitted development rights, particularly where work affects the character or appearance of the area. Birmingham and Solihull contain designated conservation areas, so the exact address matters. A property being in a conservation area does not automatically mean every extension needs permission, but it is a reason to check before relying on permitted development.

What about the 6-metre or 8-metre prior approval route?

Some larger single-storey rear extensions may use the permitted development prior approval process. This is not the same as having unrestricted permission to build. Neighbour consultation and a formal prior approval process can apply, and the relevant measurements and eligibility criteria must be checked against the current rules.

What should you check before starting?

  1. Confirm the property's planning history and any conditions attached to earlier permissions.
  2. Check whether permitted development rights apply to the property.
  3. Measure the original house, proposed projection, height and boundary distances accurately.
  4. Check conservation area, Article 4 and other local constraints.
  5. Consider whether a lawful development certificate or a planning application is the appropriate route.
Permitted development is a technical set of rules, not a general design guideline. A proposal that looks modest can still fall outside the limits. The correct route should be established for the specific property before work begins.

How GEVDÉ can help

GEVDÉ provides architectural design and planning support for house extensions in Birmingham, Solihull, Knowle, Dorridge and across the West Midlands. We can review the brief, assess the planning route, develop the design and prepare the drawings and supporting information needed for the next stage.

Every site is different, so this guide is general information rather than a determination of the planning status of a particular property. Always check the current legislation and local planning constraints before proceeding.