Why there is no reliable price per square metre for every extension
A simple rectangular rear extension with standard finishes is a very different project from a highly glazed kitchen extension with roof lanterns, structural alterations and bespoke joinery. A square-metre rate can be useful for early feasibility, but it should not be treated as a fixed quotation.
What has the biggest effect on the budget?
1. Size and shape
Larger extensions usually spread some fixed costs over more floor area. However, complex shapes, multiple corners and unusual junctions can increase labour and detailing costs.
2. Foundations and ground conditions
Drainage, nearby trees, made ground, existing foundations and access for excavation can affect the foundation design and cost. These issues are best investigated early rather than treated as an afterthought.
3. Structural alterations
Removing load-bearing walls, forming wide openings, supporting upper floors or altering the roof structure can add substantial cost. Structural engineering input and temporary works may also be required.
4. Rooflights, glazing and doors
Large sliding doors, corner glazing, roof lanterns and bespoke glass can become major cost items. Their specification also affects thermal performance, solar gain and the detailing around the opening.
5. Kitchen, bathroom and internal finishes
If the project includes a new kitchen, utility room or bathroom, the fit-out can account for a significant part of the total budget. Flooring, lighting, cabinetry and appliances should be specified at an early stage.
6. Access and the existing house
Restricted access, occupied homes, party wall matters, protection of existing finishes and the need to maintain services can all affect the programme and cost.
Remember the costs beyond the building work
- Measured surveys and architectural design.
- Planning application or lawful development certificate fees, where applicable.
- Structural engineer and other consultant fees.
- Building Regulations design and approval.
- Party Wall procedures where relevant.
- Drainage, utility diversions and specialist reports if required.
- Kitchen, appliances, flooring, decoration and landscaping.
- A contingency for unforeseen work.
How to set a realistic extension budget
Start with the outcome you want, not simply the maximum floor area. A feasibility design can test different layouts and construction approaches before detailed drawings and specifications are prepared. Once the scope is clear, a properly itemised tender gives a more useful comparison than a headline price alone.
It is also sensible to separate the construction budget from professional fees, statutory charges, client-supplied items and contingency. This makes it easier to understand what a contractor's price actually includes.
Is it cheaper to design before appointing a builder?
A coordinated design and technical package helps contractors price the same scope of work. It can expose expensive details, structural assumptions and specification gaps before they become variations on site. The aim is not simply to make the design cheaper, but to direct the budget towards the parts of the project that matter most.
Extension design in Birmingham and Solihull
GEVDÉ supports homeowners with feasibility, architectural design, planning applications, technical drawings, tender packages and construction delivery. We work across Birmingham, Solihull, Knowle, Dorridge and the wider West Midlands, tailoring each project to the property, brief and available budget.
Planning a project?
GEVDÉ supports homeowners and property developers with feasibility, architectural design, planning applications, technical drawings and construction delivery across Birmingham, Solihull and the wider West Midlands.
Discuss your project